The BAL 22305 ACCU-Slide cable replacement kit is used to repair a damaged cable in a compatible cable-operated slide-out. BAL's factory instructions explain how the existing cable guides the replacement through the jamb pulleys, where the new eye bolt and ferrule connect, and what needs checking before the room is operated again.

View the BAL 22305 cable repair kit

BAL 22305 ACCU-Slide replacement cable repair kit product photo

Original BAL cable routing and replacement instructions

Use the cable-routing drawing to trace the path through each pulley. BAL's replacement document explains how to feed the new cable along that route, secure it and restore the correct tension after installation.

ACCU-Slide cable routing diagram

Open the original cable routing diagram (PDF)

On a phone, open the PDFs separately to enlarge the routing illustration and read the full procedure.

Cable repair components

Component Purpose
Replacement stainless-steel cable Runs through the existing pulley path and replaces the failed cable
Ferrule Secures the new cable loop after crimping
Eye bolt Connects the cable loop to the cable-and-chain adjustment bracket
Braided feeding sleeve Joins the old and new cables temporarily during threading, as shown in the repair procedure
Coupling and adjustment nut Sets cable tension at the connector after replacement

Confirm your ACCU-Slide mechanism and the actual replacement cable before starting. The drawing and repair instructions apply to the cable repair procedure; complete jamb or double-back mechanisms can have a different component arrangement.

How the cable is replaced

  1. Access the damaged run. Remove the appropriate interior jamb clamp, following BAL's instructions for opening the slide room to the working position.
  2. Use the old cable as a guide. Join the existing cable and new cable with the temporary braided sleeve so the replacement follows the original path. BAL cautions against excessive tape that could jam a pulley.
  3. Feed and attach the replacement. Pull the new cable through the jamb with help from a second person, secure the outside standoff end and remove the temporary sleeve and damaged cable.
  4. Complete the cable loop. With the room fully extended, install the eye bolt and ferrule, remove cable slack and make the specified three crimps using a suitable crimping tool.
  5. Reassemble and adjust. Refit the jamb clamp, inspect cable-to-jamb alignment and follow BAL's cable adjustment procedure before operating the room normally.
Cable alignment matters: BAL identifies misaligned standoff brackets as a major cause of cable failure. When the room has been moved six inches back from full extension, check that each cable passes level through its jamb opening. Replace worn or damaged pulleys or brackets before tensioning a new cable.

Final tension and operation checks

The manufacturer calls for the specified cable deflection after adjustment and for anti-vibration blocks over the cable couplers. Adjustment must account for the opposing cables: tightening both sides excessively can overload the motor. Follow the procedure for your standard or double-back mechanism, since their adjustment points differ.

See the ACCU-Slide cable tension and troubleshooting guide for the two adjustment layouts, or the G4 Econo and Hybrid illustrated parts reference for corner pulleys and cable-chain connectors.

Bulletin des pièces de VR

Inscrivez-vous pour nos prochaines promotions !

À propos de NewRVParts

NewRVParts est une boutique en ligne spécialisée dans les pièces et accessoires neufs pour véhicules récréatifs, les équipements pour caravanes portées, les pièces de remorquage et de remorques, les accessoires pour camions et les produits nautiques. Nous servons nos clients partout au Canada et aux États-Unis, en expédiant des produits de fabricants de confiance via un vaste réseau de distribution nord-américain. Magasinez en ligne pour obtenir des pièces de rechange, des équipements et des accessoires livrés directement à votre porte.

Magasiner les pièces de VR